Green Jobs Tweet Wind Energy:Production Eng,Supervisors,Site Manager,Service Technician,VP HR,Legal

Nordex was launched in 1985, before the international demand for wind turbines increased in the first half of the nineties. One of the founding members is today’s Sales Director, Carsten Pedersen. From the outset, Nordex focused on large, powerful turbines. In just two years, the company installed the largest series wind turbine in the world at the time.

 Following the principle of small steps, Nordex has succeeded in building reliable machines, which operate with ever-increasing efficiency. Moreover, they have set new standards with several of their innovative products: the entry into the megawatt class in 1995 and the development of the first wind turbine with a capacity of 2.5 megawatts in 2000 – today one of the largest serial produced wind turbines in the world – are just two examples of this. And they are hiring in the US and . See below,

Jobs

Post a Job! $19 for 30 days

In-House Legal Counsil – Chicago

Vice Preseident Human Resources-Chicago

Production engineer -Mechanical  -Jonesboro,AR

Production Engineer – Electrical – Jonesboro AR

Supervisor- Electrical – Jonesboro , AR

Supervisor- Mechanical – Jonesboro, AR

Commissioner – Vaious locations

Site Manager – Various locations

Service Technician – Various locations

Site Supervisor/Lead – Various locations

http://www.nordex-online.com/en/company-career/career.html

Share

Short URL: http://www.mygreeneducation.com/?p=4512

Posted by on Oct 9 2009. Filed under Wind Energy Jobs. You can follow any responses to this entry through the RSS 2.0. You can leave a response or trackback to this entry

You must be logged in to post a comment Login

Search Archive

Search by Date
Search by Category
Search with Google
Log in | Designed by Gabfire themes

Featuring Recent Posts WordPress Widget development by YD